User's Manual

HUB INSTALLATION
10271450001 Revision D Commissioning HTs 7–1Hub installation
Chapter 7
Commissioning HTs
This chapter includes:
Prerequisites for commissioning – page 7–2
HT commissioning procedure – page 7–3
HT to RT connection tests – page 7–8
Commissioning refers to verification procedures to ensure that the
newly installed hub terminal (HT) is operational.
Note: Most references in this chapter are to an HT. A hub may
consist of one HT but usually consists of multiple HTs. Each
HT—an ODU, IFL, and IDU—must be commissioned separately.