User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Indoor equipment
- Ch 4 - Installing IFL cables
- Ch. 5 - Installing mast mounts
- Ch 6 - Installing ODUs
- Ch 7 - Commissioning the RT
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating the IFL cable
- Index
1027144–0001 Revision D
Installing IFL cables 4–15
RT installation
After running the cable, finish the cable installation as follows:
1. Support the cable above the roof surface with a cable trough
or wood blocks approximately 4 inches by 4 inches by 4
inches (10 centimeters by 10 centimeters by 10
centimeters):
hb010
2. Tie down cable runs on the roof and at the IDU location
with tie–wraps.
3. Seal the IFL rooftop entry point with weatherproofing
caulk.
4. Label both ends of the IFL cable to identify the cable in an
appropriate manner. This is especially important if you are
installing multiple IFL cables. (To order IFL labels, request
HNS part number 9005328–0055.)
Finishing the cable
installation