User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Indoor equipment
- Ch 4 - Installing IFL cables
- Ch. 5 - Installing mast mounts
- Ch 6 - Installing ODUs
- Ch 7 - Commissioning the RT
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating the IFL cable
- Index
RT INSTALLATION
1027144–0001 Revision D
Installing indoor RT equipment 3–1
RT installation
Chapter 3
Installing indoor RT equipment
This chapter includes:
• Rack grounding
• Installing indoor units (IDUs)
• Power supplies – page 3–8
• Installing the CCM – page 3–23
• CCM power–on test – page 3–25
• SSIs – page 3–27
• Installing expansion IDUs (EIDUs) – page 3–34
For IDU standards compliance information, see appendix B
(page B–3).