User's Manual

Table Of Contents
1027144–0001 Revision D
Prerequisites 2–7
RT installation
You will not be able to commission the RT (as detailed in chapter
7) unless the Element Management System (EMS) is operational.
Specific requirements for commissioning are:
The EMS hardware and software must be installed and
operational.
The EMS database must be loaded and operational.
The EMS operator has to enter the hub MAC address
into the EMS database.
The hub and HT are installed and operational. The HT must
be properly aligned.
Additional prerequisites for commissioning are listed in chapter 7.
The additional prerequisites are satisfied when the RT is properly
installed. The prerequisites listed above must be accomplished
prior to RT installation—or commissioning will be delayed
until they are accomplished.
2.5
Prerequisites for
commissioning