User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Indoor equipment
- Ch 4 - Installing IFL cables
- Ch. 5 - Installing mast mounts
- Ch 6 - Installing ODUs
- Ch 7 - Commissioning the RT
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating the IFL cable
- Index
1027144–0001 Revision D
Installation summary 1–3
RT installation
Components to be installed
The following AIReach Broadband components are installed at the
RT site:
• ODU(s) – Integrated antenna and transceiver
• IFL
• Indoor unit(s) (IDU), including:
- IDU channel and control module (CCM)
- IDU service–specific interfaces (SSIs)
Summary of installation steps
RT installation consists of the following main tasks:
Ground the rack (if a rack is used) – page 3–2
Install IDU chassis – page 3–3
Ground the IDU chassis – page 3–11 (ac) or 3–14 (dc)
Connect power to power supply – page 3–12 (ac) or 3–14 (dc)
Install CCM – page 3–23
CCM power–on test – page 3–25
Install SSIs – page 3–27
Install expansion IDUs (EIDUs) (if used) – page 3–34
Determine IFL cable route – page 4–5
Install the IFL cable (inside the building) – page 4–8
Install IFL lightning arrestor – page 4–9
Ground the lightning arrestor– page 4–12
Install the IFL cable (on the roof) – page 4–13
Test the IFL cable – page 4–14