1027144–0001 Revision D 7–4 Commissioning the RT
RT installation
This section describes how to use the LCD and buttons on the
CCM front panel (figure 7-2). You need to use the LCD to
commission the RT.
The LCD:
• Shows CCM startup diagnostics (SUDS) tests as they occur
• Shows the system boot up sequence
• Shows the software loading sequence
• Indicates the status and operational state of system
components
• Provides functions necessary for commissioning the RT
Figure 7-2 CCM front panel LCD
TM
BROADBAND
Main Menu
Install
ENTERPREVNEXT
T0009049
LCD
7.3
Front panel LCD
operation