User's Manual

Table Of Contents
1027144–0001 Revision D 7–4 Commissioning the RT
RT installation
This section describes how to use the LCD and buttons on the
CCM front panel (figure 7-2). You need to use the LCD to
commission the RT.
The LCD:
Shows CCM startup diagnostics (SUDS) tests as they occur
Shows the system boot up sequence
Shows the software loading sequence
Indicates the status and operational state of system
components
Provides functions necessary for commissioning the RT
Figure 7-2 CCM front panel LCD
TM
BROADBAND
Main Menu
Install
ENTERPREVNEXT
T0009049
LCD
7.3
Front panel LCD
operation