User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Indoor equipment
- Ch 4 - Installing IFL cables
- Ch. 5 - Installing mast mounts
- Ch 6 - Installing ODUs
- Ch 7 - Commissioning the RT
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating the IFL cable
- Index
1027144–0001 Revision D
Commissioning the RT 7–3
RT installation
Connect the IFL cable to the CCM (IDU):
1. Go to the IDU location.
2. Make sure power to the IDU is off (or disconnected).
A label on the CCM front panel advises:
CAUTION: POWER DOWN
ODU BEFORE CONNECTING
OR DISCONNECTING IF
Removing power from the IDU powers down the ODU.
Make sure the IDU is powered off before you connect or
disconnect the IFL cable.
3. Using a 90° adapter, connect the IFL (N connector) to the
CCM IFL interface, as shown in figure 7-1.
1
2
3
4
5
TM
BROADBAND
ENTERPREVNEXT
RT CCM
T0009047
CCM
IDU
IFL
interface
IFL
N connector
90 adapter°
Figure 7-1 Connecting the IFL cable
4. Power on the IDU.
7.2
Connecting the IFL
to the CCM (IDU)