User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Installing mast mounts
- Ch 4 - Installing ODUs
- Ch 5 - Installing IFL cables
- Ch 6 - Indoor equipment
- Ch 7 - Commissioning HTs
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating IFL cables
- Index
HUB INSTALLATION
1027145–0001 Revision E Installing indoor hub equipment 6–1Hub installation
Chapter 6
Installing indoor hub equipment
This chapter includes:
• Installing the hub rack – page 6–2
• Installing indoor units (IDUs) – page 6–7
• Power supplies – page 6–11
• Installing the CCM – page 6–26
• SSIs – page 6–28
• Connecting the IFL to the CCM – page 6–33
• CCM redundancy bus cable – page 6–34
• Front panel LCD operation – page 6–35
• CCM power–on test – page 6–37
• Hub LAN router and LAN hub – page 6–39
For IDU standards compliance information, see appendix B
(page B–3).