User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Installing mast mounts
- Ch 4 - Installing ODUs
- Ch 5 - Installing IFL cables
- Ch 6 - Indoor equipment
- Ch 7 - Commissioning HTs
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating IFL cables
- Index
1027145–0001 Revision E 5–10 Installing IFL cables
Hub installation
2. Route the cable from the IDU chassis location through the
base of the lightning arrestor and the restraining fitting, as
shown in figure 5-6.
Figure 5-6 Routing IFL cable
T0006028
From
IDU
Restraining
fitting
Terminate with
N connector
here.
3. Terminate the end of the IFL cable with an N connector.
For detailed instructions for connecting an N connector, see
appendix C.
4. Connect the cable to the RF arrestor, as shown in figure 5-7.
5. Working from inside the arrestor body, use a wrench to
tighten the restraining fitting.
6. If you are installing additional IFL cables, repeat steps 1
through 5
hb080
RF arrestor
Figure 5-7 Connecting the IFL cable to the RF arrestor