User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Installing mast mounts
- Ch 4 - Installing ODUs
- Ch 5 - Installing IFL cables
- Ch 6 - Indoor equipment
- Ch 7 - Commissioning HTs
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating IFL cables
- Index
1027145–0001 Revision E
Prerequisites 2–5
Hub installation
Table 2-1 Tools required for HT installation – Cont’d.
(includes tools for IFL installation, antenna alignment, and initial testing)
√
Purpose (or other comments)Item
Protractor
Used to align antenna. Must show 0° increments
from 0° to 180°.
Compass Used as an aid in aligning the antenna. Must be
accurate to within ±1°
Chalk or other marker For antenna alignment; to mark lines on the roof
Optional: Chalked plumb line
(the type you snap to
leave a straight chalk line)
For antenna alignment; to mark lines on the roof
Inclinometer Used to set antenna elevation
Personnel safety lines For safety on roof
Back brace To protect against back injury while hoisting or
lifting equipment and installation materials
Test set(s)
(DS1, DS3, or both)
For commissioning tests. Test set type(s) needed
depends on services the hub supports (DS1,
DS3, or both).
Note: Vendor names, model numbers, and part numbers identify equipment known to
be suitable. Other comparable equipment may also be suitable.