User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Installing mast mounts
- Ch 4 - Installing ODUs
- Ch 5 - Installing IFL cables
- Ch 6 - Indoor equipment
- Ch 7 - Commissioning HTs
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating IFL cables
- Index
1027145–0001 Revision EIndex-2
Configuration downloading (CCM), 7–6
Connections
checking, 6–37, 8–3
weatherproofing, 8–2
Corrugated metal roof, 3–11
Crimp tool, C–7
Customer equipment, connecting, 8–3
Customer sign–off, 8–3
D
Devices, CCM, 7–5
Diagnostic mode, 6–35
Diameter of ODU mast, 4–5
Dismantling an HT, 10–14
Documents, related, vii
Drawings
hub network schematic, 2–1
hub reference drawing, 1–2
hub rooftop drawing, 2–1
DS1 test, 7–11
DS1 test (fractional DS1), 7–15
DS3 test, 7–13
DS3 test (fractional DS3), 7–17
DS3–TDM SSI, 6–28
DS3–transparent SSI, 6–29
E
Element Management System. See EMS
Elevation
adjusting, 4–20
fine adjustment, 4–22
explained and illustrated, 4–20
Emissions, B–2, B–3
EMS, 2–7, 7–2
database, 7–2
Equipment from other vendors, vii
equipment to be installed, 2–1
Ethernet switch (for hub LAN), description, 6–39
Existing structures as ODU mounts, 3–13
Exit (LCD), 6–36
F
FAILED message, 7–4
Failure indication on CCM LCD, 6–39
FCC, B–2, B–3
Fractional DS1 test, 7–15
Fractional DS3 test, 7–17
Front panel display. See LCD
G
Grounding
lightning arrestor, 5–12
ODU, 4–25
power supply
ac, 6–14
dc, 6–16, 6–17
dual ac or dc, 6–12
rack, 6–6
H
Handling materials, 3–4
Heat–shrink tubing (for IFL cable) , C–3, C–11
HT
defined, 1–2
dismantling, 10–14
HT alignment direction, 4–6
HT Disabled message, 7–3, 7–6
HT Enabled message, 7–3, 7–6
HT to RT connections tests, 7–11
Hub LAN router, description, 6–39
Hub LAN switch, description, 6–39
Hub rack, 6–2
grounding, 6–6
installing, 6–2
concrete floor, 6–3
wood floor, 6–4
lifting, 6–3
location, 6–2
Hub terminal. See HT