User's Manual

Table Of Contents
10271450001 Revision E 14 Installation summary Hub installation
Connect the IFL cable to the ODU page 515
Install the hub rack (optional) page 62
Ground the rack page 66
Install indoor unit (IDU) page 67
Connect power supply page 611
Ground the IDU chassis (if required) page 614 (ac) or
617 (dc)
Install CCM page 626
Install SSIs page 628
Connect IFL to the CCM page 633
For each IDU, repeat steps on pages 6–7 through 6–33.
Install CCM redundancy bus cable (if backup HT is present)
page 634
Conduct CCM poweron test page 637
Check component status page 77
Verify prerequisites for commissioning page 72
Perform commissioning steps page 73
Test HT to RT connections (if possible) page 711
Weatherproof connections page 82
Obtain customer signoff page 83
For detailed installation instructions, see chapters 2 through 8.