User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Installing mast mounts
- Ch 4 - Installing ODUs
- Ch 5 - Installing IFL cables
- Ch 6 - Indoor equipment
- Ch 7 - Commissioning HTs
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating IFL cables
- Index
HUB INSTALLATION
1027145–0001 Revision E Maintenance 10–1Hub installation
Chapter 10
Maintenance
The AIReach Broadband physical system requires no routine
maintenance. However, to facilitate expansion, reconfiguration, or
repairs, you may need to add, move, or replace components. This
chapter includes instructions for:
• Adding or moving SSIs – page 10–2
• Replacing components – page 10–3
• Replacing the ODU – page 10–3
• Replacing the IDU chassis – page 10–8
• Replacing the CCM – page 10–10
• Replacing SSIs – page 10–11
• Replacing the IFL – page 10–12
• Dismantling an HT – page 10–14