1027145–0001 Revision E 7–10 Commissioning HTs Hub installation
At this point, HT commissioning is complete, except for the HT to
RT tests described in section 7.4. You may or may not be able to
complete these tests, depending on whether or not other network
components are installed and operational. (See the test
requirements listed in section 7.4.)
Leave the HT powered on for testing and operation.