HUB INSTALLATION
1027145–0001 Revision E Commissioning HTs 7–1Hub installation
Chapter 7
Commissioning HTs
This chapter includes:
• Prerequisites for commissioning – page 7–2
• HT commissioning procedure – page 7–3
• Checking component status – page 7–7
• HT to RT connection tests – page 7–11
Commissioning refers to verification procedures to ensure that the
newly installed hub terminal (HT) is operational.
Note: Most references in this chapter are to an HT. A hub may
consist of one HT but usually consists of multiple HTs. Each
HT—an ODU, IFL, and IDU—must be commissioned separately.