User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Installing mast mounts
- Ch 4 - Installing ODUs
- Ch 5 - Installing IFL cables
- Ch 6 - Indoor equipment
- Ch 7 - Commissioning HTs
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating IFL cables
- Index
1027145–0001 Revision E 6–38 Installing indoor hub equipment Hub installation
3. Also observe the CCM startup diagnostics (SUDS) on the
CCM’s front panel LCD:
(For the tests and status checks described in this chapter, the
HT does not have to be connected to the EMS.)
SUDS start on powerup. While they run, the CCM front
panel shows the following messages, in the sequence
shown.
Equipment function is normal when you see the
messages shown below and no failure messages.
Initial powerup
SUDS CPU Reg OK
SUDS DRAM OK
CPU registers and dynamic
RAM are tested.
Timer test
SUDS Timer Test
Timers are tested.
Watchdog timer test
SUDS WDT Test
The watch dog timer
is tested.
PCI test
SUDS PCI Test
The PCI controller is tested.
Static dual port RAM test
SUDS SDPRAM Test
Static dual port RAM is tested.
Serial port 1 test
SUDS Ser 1 Test
Serial port 1 is tested.