Installation & Assembly
Modern American Blacksmiths | Fine, Hand-Crafted Lighting
Castleton, Vermont USA | HUBBARDTONFORGE.COM
39845
Assembly & Installation Instructions
If you need further assistance, or nd that you are missing any parts, please contact the dealer from which you purchased this product.
We hope you enjoy your xture!
* Hubbardton Forge will not be liable for injury or damage caused by improper installation, lamping or use of this xture.
B374
Orbit Sconce 209335
Page 4 of 4
H
G
I
K
J
F
A
E
LONG STUD
(Figure 2)
To Finish Installation (Figure 2)
1. Remove knurled ball (F) and cover plate (E). Retain for later use.
Note: Magnets are also used to hold cover plate (E) so a small amount of force will be needed to remove cover
plate (E).
2. Remove countersunk screws (H) along with countersunk plate (G) and retain for later use.
Note: Taking note of plate (G) alignment will aid in later installation.
3. Place glass (I) over LED (J) and press up against foam tape (K) on xture (A).
Note: Design preference is with textured side of glass (I) towards the wall.
4. Replace countersunk plate (G) onto xture (A) and install countersunk screws (H) to secure glass (I).
5. Align long stud in cover plate (E) with lower hole in xture (A). Press cover plate (E) tight to xture (A) until magnets
contact plate (E).
6. Secure cover plate (E) with knurled ball (F).
7. Restore electricity at main breaker.