Installation Sheet
Assembly & Installation Instructions A381
Erlenmeyer 4lt Semi-Flush 128710 Page 1 of 2
Modern American Blacksmiths | Fine, Hand-Crafted Lighting
Castleton, Vermont USA | HUBBARDTONFORGE.COM 32255 Rev A
Please Note: After installation extra hardware and accessories are possible due to our kits are used on multiple products
and options.
To Complete Fixture Assembly (Figure 1)
Component Parts
A Fixture
B Crossbar
C Fixture Mounting Bracket
D Threaded Stud (2)
E Knurled Ball (2)
F Ground Screw
G Nipple
H Cover
I Cap
Caution: Be sure power is off at the main
breaker box prior to installation.
1. Carefully unpack the fixture from the
carton.
2. Thread studs (D) through
appropriate holes in the crossbar (B)
to match holes in fixture mounting
bracket (C). Move ground screw (F)
to another available threaded hole if
necessary.
3. Using two machine screws (not
provided), fasten the crossbar (B)
to the electric box using outer oval
slots to orient fixture to desired
hanging position.
Note: A new electric box comes with
screws. When replacing a fixture, retain
the existing screws for use with the new
fixture.
4. Slide fixture (A) over threaded studs (D)
and push firmly to ceiling making sure no
wires are pinched between fixture canopy
and ceiling. Fasten with knurled balls (E).
Be sure studs (D) are fully seated in knurled
balls (E).
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL
INJURY OR DEATH AND PROPERTY DAMAGE. We recommend installation by a licensed electrician.
This product must be installed in accordance with applicable installation code(s), by a person familiar with the
construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture.
(Figure 1)