LampSite Installation Guide Issue 02 Date 2014-05-27 HUAWEI TECHNOLOGIES CO., LTD.
Copyright © Huawei Technologies Co., Ltd. 2014. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders.
LampSite Installation Guide About This Document About This Document Overview This document describes how to install the modules and cables for the RHUB3908 and pRRU3901 indoors. It also provides checklists for hardware installation. Product Version The following table lists the product version related to this document.
LampSite Installation Guide Contents Contents About This Document.....................................................................................................................ii 1 Changes in LampSite Installation Guide.................................................................................1 2 Installation Preparations..............................................................................................................4 2.1 Reference Documents........................................
LampSite Installation Guide Contents 5.1 Information About the Installation...............................................................................................................................46 5.1.1 pRRU Product Family...............................................................................................................................................46 5.1.2 pRRU Installation Scenario......................................................................................................
LampSite Installation Guide 1 1 Changes in LampSite Installation Guide Changes in LampSite Installation Guide This chapter describes the changes in the LampSite Installation Guide. 02 (2014-05-27) This is the second commercial release. Compared with 01 (2014-04-26), no information is added. Compared with 01 (2014-04-26), this issue incorporates the following change: Content Change Description Entire document Added the descriptions about the LTE FDD +LTE FDD mode.
LampSite Installation Guide 1 Changes in LampSite Installation Guide Draft C (2014-03-26) This is a draft release. Compared with Draft B (2014-02-28), no information is added. Compared with Draft B (2014-02-28), this issue incorporates the following changes: Content Change Description 4.4.7 Installing CRPI Optical Cables Added the description of connecting the CPRI cable to the TX and RX ports of the optical module crossly. 5.1.
LampSite Installation Guide 1 Changes in LampSite Installation Guide l RHUB Ports and Indicators l pRRU Exterior l pRRU Ports and Indicators Draft A (2013-11-30) This is a draft release. Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 2 Installation Preparations 2 Installation Preparations About This Chapter Before starting the installation, you must obtain the required reference documents, tools, and instruments, and familiarize yourself with the skills required. 2.1 Reference Documents Before the installation, you must read the following documents: 2.2 Preparing Tools and Instruments This section describes the tools and instruments that must be prepared before the installation. 2.
LampSite Installation Guide 2 Installation Preparations 2.1 Reference Documents Before the installation, you must read the following documents: l LampSite Hardware Description l Installation Reference For details about how to install a baseband unit (BBU), see DBS3900 Installation Guide. 2.2 Preparing Tools and Instruments This section describes the tools and instruments that must be prepared before the installation.
LampSite Installation Guide 2 Installation Preparations Multimeter Network cable tester Vacuum cleaner Ladder Torque wrench for SMA connector Socket wrench (M6) 2.3 Requirements for Installation Personnel This section describes requirements for installation engineers. They must be qualified and trained, and familiar with correct operation methods and safety precautions before performing any operations.
LampSite Installation Guide 3 Unpacking and Checking 3 Unpacking and Checking This section describes how to unpack and check the delivered equipment to ensure that the materials are complete and intact. Context NOTE The following lists important notes when you are transporting, lifting, or installing the equipment or components: l Protect them from colliding with doors, walls, shelves, or other objects. l Wear clean gloves and do not touch them with bare hands, sweat-soaked gloves, or dirty gloves.
LampSite Installation Guide 3 Unpacking and Checking If... Then... The exterior of each packing box is intact Go to Step 3. It is damaged or soaked Report the problems and causes to the local Huawei office. The collision label is red Do not unpack the packing box and claim for compensation from the transportation company. Step 3 Check the type and quantity of the equipment in the boxes according to the packing list. If... Then...
LampSite Installation Guide 4 Installing an RHUB 4 Installing an RHUB About This Chapter This chapter describes the process of installing an RHUB. 4.1 Information About the Installation This section describes the information to be learnt before RHUB installation, including the RHUB installation scenarios, clearance, and installation environment. 4.
LampSite Installation Guide 4 Installing an RHUB 4.1 Information About the Installation This section describes the information to be learnt before RHUB installation, including the RHUB installation scenarios, clearance, and installation environment. 4.1.1 RHUB Installation Scenarios An RHUB can be installed in a 19-inch cabinet, rack, shelf, or on a wall. The RHUB supports that mounting ears are installed in standard mode or reverse mode. The reverse mode is used by default.
LampSite Installation Guide 4 Installing an RHUB Installing an RHUB in a 19-Inch Cabinet or Rack Installing an RHUB in a 19-inch cabinet or rack: Secure the mounting ear to the mounting bracket by using M6 screws. l If there is no other modules installed in the 1 U space near the RHUB, install the RHUB directly. Otherwise, remove the modules before installing the RHUB. l Before installation, you need to check the installation mode supported by the rack and adjust the position of the mounting ear.
LampSite Installation Guide 4 Installing an RHUB Figure 4-5 and Figure 4-6 show RHUBs installed in a 19-inch shelf. Figure 4-5 RHUB installed in a 19-inch shelf in standard mode Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 4 Installing an RHUB Figure 4-6 RHUB installed in a 19-inch shelf in reverse mode Installing an RHUB on a Wall Figure 4-7 shows an RHUB installed on a wall. Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 4 Installing an RHUB Figure 4-7 RHUB installed on a wall 4.1.2 Installation Clearance Requirements of an RHUB When an RHUB is installed in a 19-inch cabinet, rack, shelf, or on a wall, a minimum clearance is required for easy cabling and operation and maintenance. A recommended installation clearance is provided based on experience. Figure 4-8 shows the installation clearance for the RHUB installed in a 19-inch cabinet, rack, or shelf.
LampSite Installation Guide 4 Installing an RHUB Figure 4-9 Recommended installation clearance for a wall-mounted RHUB (unit: mm) Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 4 Installing an RHUB Figure 4-10 Minimum installation clearance for a wall-mounted RHUB (unit: mm) NOTICE A clearance of 350 mm must be reserved in front of the air inlet of the fan of the power supply unit (PSU) for maintenance. 4.1.3 Installation Environment of an RHUB The installation environment of an RHUB involves the running environment specifications for the RHUB and other specifications.
LampSite Installation Guide 4 Installing an RHUB Table 4-1 RHUB environment specifications Specifi cations Installation Scenario RHUB Quantity Condition Remarks Operati ng tempera ture Installed on a wall or in a 19inch rack. N/A -5°C to +50° C N/A Installed in a shelf. 1 -5°C to +45° C N/A 2 -5°C to +43° C N/A 3 -5°C to +40° C N/A Relativ e humidit y Installed in all scenarios. N/A 5% RH to 95% RH N/A Altitude N/A N/A -60 m to +1800 m Works properly.
LampSite Installation Guide 4 Installing an RHUB 4.2 Installation Process The RHUB installation involves installing an RHUB module, installing RHUB cables, checking the RHUB hardware installation, and powering on the RHUB. Figure 4-11 shows the RHUB installation process. Figure 4-11 RHUB installation process 4.3 Installing an RHUB An RHUB can be installed in a cabinet, rack, shelf, or on a wall. 4.3.
LampSite Installation Guide 4 Installing an RHUB Figure 4-12 Pushing an RHUB into a cabinet 2. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 4-13. Figure 4-13 Tightening screws l The following describes how to install an RHUB with mounting ears aligned with the RHUB panel: NOTE If necessary, request one more person for assistance. 1.
LampSite Installation Guide 4 Installing an RHUB Figure 4-14 Removing mounting ears and screws 2. Use a torque screwdriver or Phillips screwdriver to tighten the four M4×8 screws with a torque of 1.4 N•m to install the removed mounting ears again, as shown in Figure 4-15. The mounting ears must be aligned with the RHUB panel. Figure 4-15 Installing mounting ears in standard mode 3.
LampSite Installation Guide 4 Installing an RHUB Figure 4-16 Pushing an RHUB into a cabinet 4. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 4-17. Figure 4-17 Tightening screws ----End 4.3.2 Installing an RHUB in a 19-Inch Shelf If a shelf houses more than one RHUB, 1 U space is required between two RHUBs. The PSU must be installed at the bottom of the cabinet.
LampSite Installation Guide 4 Installing an RHUB 1. With one hand holding it, align the mounting holes with the installation holes, slowly push the RHUB into the required position in the shelf. 2. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 4-18.
LampSite Installation Guide 4 Installing an RHUB Figure 4-19 Removing mounting ears and screws 2. Use a torque screwdriver or Phillips screwdriver to tighten the four M4×8 screws with a torque of 1.4 N•m to install the removed mounting ears again, as shown in Figure 4-20. The mounting ears must be aligned with the RHUB panel. Figure 4-20 Installing mounting ears in standard mode Issue 02 (2014-05-27) 3.
LampSite Installation Guide 4 Installing an RHUB Figure 4-21 Tightening screws ----End 4.3.3 Installing an RHUB on a Wall An RHUB can be installed on a wall. Procedure Step 1 The mounting ears are installed in reverse mode by default. Before installing an RHUB on a wall, modify the installation mode of the mounting ears on the RHUB. l Use a torque screwdriver or Phillips screwdriver to remove the mounting ears on both sides of the RHUB by removing the four M4×8 screws, as shown in Figure 4-22.
LampSite Installation Guide 4 Installing an RHUB Figure 4-22 Removing screws and mounting ears l Rotate the mounting ears 90 degrees clockwise, and use a torque screwdriver or Phillips screwdriver to secure the mounting ear with a torque of 1.4 N•m, as shown in Figure 4-23. Figure 4-23 Installing mounting ears and screws Step 2 Determine the position on the wall for installing the RHUB based on the requirements in the engineering blueprint and 4.1.2 Installation Clearance Requirements of an RHUB.
LampSite Installation Guide 4 Installing an RHUB Figure 4-24 Anchor points for installing an RHUB on a wall (1) Level (2) RHUB (3) Wall CAUTION To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Drill holes at the anchor point and install expansion bolts, as shown in Figure 4-25. Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 4 Installing an RHUB Figure 4-25 Drilling holes and installing expansion bolts (1) M6×60 expansion bolt (2) Nut (3) Spring washer (4) Flat washer (5) Extension tub 1. Use a hammer drill with bit 8 to drill holes with a diameter of 8 mm and a depth of 45 mm to 50 mm at the marked anchor points. All the holes have the same depth. 2. Use a vacuum cleaner to clear the dust inside and around each hole.
LampSite Installation Guide 4 Installing an RHUB Figure 4-26 Installing an RHUB on a wall NOTE As shown in the preceding figure, when the RHUB is placed against the wall, ensure that the RHUB panel is vertical to the ground and the PSU is on the lower part of the RHUB panel. ----End 4.4 Installing RHUB Cables This section describes how to install cables for an RHUB. 4.4.
LampSite Installation Guide 4 Installing an RHUB l The bending radius of the 7/8" feeder and 5/4" feeder are greater than 250 mm and 380 mm, respectively. l The bending radius of the 1/4'' jumper, the 1/2'' softer jumper, and the 1/2'' common jumper are greater than 35 mm, 50 mm, and 127 mm, respectively. l The bending radius of a power cable or a protection ground (PGND) cable is at least three times the diameter of the cable.
LampSite Installation Guide 4 Installing an RHUB l PGND cables for a base station are connected to the same ground bar. l PGND cables are buried in the ground or routed indoors. They cannot be routed overhead before they are routed into the equipment room. l Outer conductors of coaxial cables and both ends of the shield layers on shielded cables are in proper electrical contact with the metal surface of the equipment to which they are connected.
LampSite Installation Guide 4 Installing an RHUB Table 4-2 RHUB cable list Cable One End The Other End Connector Connected to... Connector Connected to... PGND cable OT terminal (M4, 6 mm2 [0.009 in. 2]) Ground screws on the RHUB OT terminal (M6, 6 mm2 [0.009 in.
LampSite Installation Guide 4 Installing an RHUB 4.4.3 Cable Connections This section describes the cable connections for an RHUB. Figure 4-27 shows the cable connections for an RHUB. The port connected to the Ethernet switch serves as a reserved port.
LampSite Installation Guide 4 Installing an RHUB Figure 4-28 RHUB cable installation process 4.4.5 Installing an RHUB PGND Cable An RHUB PGND cable ensures proper grounding of an RHUB. Prerequisites The OT terminals at both ends of the PGND cable are prepared. Context The yellow and green or green PGND cable is a single cable. The cross-sectional area of the PGND cable is 6 mm2 (0.009 in.2). Both ends of the cable are OT terminals, as shown in Figure 1.
LampSite Installation Guide 4 Installing an RHUB NOTE l If the PGND cable is provided by the customer, a copper-core cable with a minimum cross-sectional area of 6 mm2 (0.009 in.2) or 10 AWG is recommended. l The OT terminals at both ends of the PGND cable are assembled at the site. l The M6 OT terminal has the default size. You can replace it with another OT terminal of the expected size based on the site requirement. NOTICE l Ensure proper grounding of the RHUB using a PGND cable.
LampSite Installation Guide 4 Installing an RHUB Figure 4-31 Installing an RHUB PGND cable Step 3 Use a torque screwdriver or Phillips screwdriver to secure the M8 OT terminal at one end of the PGND cable to the wiring terminal on the ground bar at the site with a torque of 1.4 N•m. ----End 4.4.6 Installing an Ethernet Cable This section describes how to install an Ethernet cable. Prerequisites l Ethernet cables are not delivered, and they must be prepared onsite.
LampSite Installation Guide 4 Installing an RHUB Step 2 Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the pRRU panel. Step 3 Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender.
LampSite Installation Guide 4 Installing an RHUB Procedure Step 1 Install an optical module, as shown in Figure 4-33 and Figure 4-34. 1. Remove the dust-proof cap from the CPRI port on the RHUB panel. 2. Remove the dust-proof cap on the optical module. 3. Lower the puller of the optical module. 4. Insert the optical module into the CPRI port on the RHUB, BBU or ODF. 5. Raise the puller of the optical module.
LampSite Installation Guide 4 Installing an RHUB One End Connect or The Other End Connected to Connector Connected to BBU/ LBBP&WBBP&UBBP/ CPRI port FC, SC, or LC connector ODF CPRI0 or CPRI1 port on the RHUB NOTE l If one end of the CPRI cable is connected to the DLC connector, the other end connects the BBU or RHUB through the DLC connector. If one end of the CPRI cable is connected to the ODF adapter, the other end connects the BBU or RHUB through a connector corresponding to the adapter.
LampSite Installation Guide 4 Installing an RHUB Prerequisites Connectors for an alarm cable are prepared. Context Figure 4-36 shows the exterior of an RHUB alarm cable. 4.4.2 RHUB Cable List shows the installation position on both ends of the RHUB cable. Figure 4-36 RHUB alarm cable Procedure Step 1 Connect the RJ45 connector on one end of the alarm cable to the EXT_ALM port on the RHUB. Step 2 Connect the other end of the alarm cable to the alarm cable port on the device to be monitored. ----End 4.4.
LampSite Installation Guide 4 Installing an RHUB Figure 4-37 Installing an RHUB power cable ----End 4.5 Checking the RHUB Hardware Installation After an RHUB is installed, check the installation of hardware including the devices and related cables. Table 4-4 lists the hardware installation checking items. Table 4-4 Hardware installation checking list No. Item 1 The position for each device conforms to the engineering design and meets the space requirement.
LampSite Installation Guide 4 Installing an RHUB No. Item 2 The power cables or the PGND cables are not inversely connected or shortcircuited. 3 The power cables and PGND cables are bound separately from other cables. 4 Labels are attached to both ends of the power cables, PGND cables, optical fibers, and Ethernet cables. 5 The power cables and PGND cables are intact. 6 The power cables and PGND cables have no weld nugget.
LampSite Installation Guide 4 Installing an RHUB Table 4-7 lists the checking items for other cable connections. Table 4-7 Checklist for other cable connections No. Item 1 The connectors of the other cables must securely connected. 2 Labels on the cables are legible and bound based on the engineering requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged. 3 Positions for routing the cables must meet requirements of the engineering design. 4.
LampSite Installation Guide 4 Installing an RHUB Step 3 Power on the RHUB. Wait 3 to 5 minutes, check the status of the RUN indicator of the RHUB after the RHUB runs properly. If the Status of the RUN Indicator... It Indicates that... Then... Steady on The power supply is normal while the board is faulty. Power off the RHUB, and power on it again after rectifying the board fault. Steady off There is no power input or the board is faulty. Power off the RHUB, and check the power input again.
LampSite Installation Guide 5 Installing a pRRU 5 Installing a pRRU About This Chapter This chapter describes the pRRU installation process. A pRRU can have two transmission ports or three transmission ports, requiring the same installation operations. Unless otherwise specified, this document uses the pRRU with three transmission ports as an example. 5.
LampSite Installation Guide 5 Installing a pRRU 5.8 Checking the pRRU Hardware Installation pRRU hardware installation checking includes hardware and cable installation checking. 5.9 Powering on the pRRU This section describes the power-on check on the pRRU after the pRRU hardware is installed and checked. Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU 5.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU, including the pRRU product family, installation scenarios, installation space and environment requirements. 5.1.1 pRRU Product Family This chapter describes the configurations and functions of the pRRU components. Table 5-1 lists the pRRU product family.
LampSite Installation Guide 5 Installing a pRRU Installing a pRRU on a wall NOTE l The pRRU must keep a minimum of 0.5 m away from the power equipment with interference, and keep a minimum of 2 m away from the source with radiation. l The pRRU must keep away from a metal wall to avoid the impact on the antenna performance. When a pRRU is installed on a wall, installation modes vary with the quality of wall, as shown in Table 5-2.
LampSite Installation Guide 5 Installing a pRRU Installation Mode Requirements Mounting Brackets Installing the pRRU on a wall using a plate on a metal wall l The wall cannot bear a load at least four times the weight of the pRRU. For example, EPS walls, MDF walls, or walls cannot be drilled. The plate is prepared by customers. Installation Diagram l The wall is too thick to drill, and the pRRU cannot be installed on a wall using a V clamp through an attachment plate.
LampSite Installation Guide 5 Installing a pRRU Installation Mode Requirements Mounting Brackets Installing the pRRU on a ceiling using a V clamp through an attachment plate l The ceiling, such as a concrete ceiling, can bear a load at least four times the weight of the pRRU. 1. Plate For details, see 5.4.5 pRRU Installed on a Plate. Installing the pRRU on a pole For details, see 5.4.4 pRRU Installed on a Pole. Installing the pRRU on a keel For details, see 5.4.6 pRRU Installed on a Keel.
LampSite Installation Guide 5 Installing a pRRU Table 5-4 Pole-mounted suggestion Installation Mode Requirements Mounting Brackets Installing the pRRU on a pole The diameter of the pole ranges from 30 mm to 70 mm. 1. Plate The diameter of the pole ranges from 70 mm to 110 mm. 1. Plate For details, see 5.4.4 pRRU Installed on a Pole. Installation Diagram 2. V clamp 3. Bolt (M6X80) 2.
LampSite Installation Guide 5 Installing a pRRU pRRU Space Requirements When the pRRU is installed on a wall, ceiling, pole or keel, the minimum space is required for easy cabling and O&M. Based on the engineering practice, the recommendation for the installation space is provided. Figure 5-1 shows the recommended space requirements of the pRRU when the external antenna is required.
LampSite Installation Guide 5 Installing a pRRU Figure 5-2 Minimum space requirements of the pRRU When the external antenna is not required, the minimum space for installing a single pRRU is described as follows: l At least 50 mm above the pRRU is reserved for maintenance. l At least 150 mm under the pRRU is reserved for cabling. l At least 50 mm on the left of the pRRU is reserved for maintenance. l At least 50 mm on the right of the pRRU is reserved for maintenance.
LampSite Installation Guide 5 Installing a pRRU The recommended space for installing the Extender is described as follows: l At least 150 mm above the Extender is reserved for cabling. l At least 150 mm under the Extender is reserved for cabling. 5.1.4 pRRU Installation Environment Requirements The installation environment of a pRRU involves the running environment specifications for the pRRU and other specifications.
LampSite Installation Guide 5 Installing a pRRU 5.2 Obtaining the MAC Address (Optional) Before installing a pRRU, record the media access control (MAC) address, which will be used during pRRU commissioning. This section applies only when a pRRU with three transmission ports is configured with a Wi-Fi daughter board. Context The MAC address indicates the IP address through which a device can be reached.
LampSite Installation Guide 5 Installing a pRRU Figure 5-5 pRRU installation process 5.4 Installing a pRRU This section describes the pRRU installation process. A pRRU can be installed on a wall, ceiling, indoor metal pole, or keel. A pRRU can have two transmission ports or three transmission ports, requiring the same installation operations. Unless otherwise specified, this document uses the pRRU with three transmission ports as an example.
LampSite Installation Guide 5 Installing a pRRU NOTE l The pRRU cannot be grounded. If the pRRU is grounded but the RHUB connected to this pRRU is not, the pRRU may fail to be powered on. l A minimum distance of 50 cm must be reserved between the pRRU and the incandescent lamp. l The installation spacing between the pRRU and the temperature sensor must be greater than 50 cm.
LampSite Installation Guide 5 Installing a pRRU Figure 5-7 Plate specifications 5.4.2 pRRU Installed on a Wall If the wall indoors has sufficient load bearing capacity and space, the pRRU is recommended to install on a wall. If the wall cannot bear the capacity, choose an installation mode based on site requirements. Context NOTICE This section only describes the procedure of installing the pRRU on a wall without any other auxiliary devices.
LampSite Installation Guide 5 Installing a pRRU Figure 5-8 Anchor points of the pRRU installation kits (unit: mm) (1) Wall (2) Plate (3) Anchor point CAUTION To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with a φ 8 bit to drill holes at the marked anchor points as shown in as shown in Figure 5-9. Use the cleaner to clean the dust inside and around the holes and measure the distance between them.
LampSite Installation Guide 5 Installing a pRRU Figure 5-9 Drilling holes and installing expansion bolts Step 4 Lead the M6x50 screw through the washer, and then through the drilling holes of the plate to the plastic expansion sleeve, and tighten the screw to a torque of 5 N•m, as shown in Figure 5-10. Figure 5-10 Installing the plate Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU NOTE If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the four hooks of the pRRU into the installation kits, as shown in Figure 5-11. If the hooks are properly installed, a slight clack can be heard. NOTE It is recommended that you observe the installation from one side of the pRRU when inserting hooks into the kits.
LampSite Installation Guide 5 Installing a pRRU Context NOTICE If the pRRU is installed on the ceiling, the temperature of the ceiling may increase by a maximum of 30 degrees. Therefore, whether a pRRU can be installed on a ceiling depends on the ceiling material. Procedure Step 1 Determine the position for installing the pRRU based on the construction blueprint and the space requirements. NOTE For pRRU installation space requirements, see 5.1.3 Space Requirements.
LampSite Installation Guide 5 Installing a pRRU Step 3 Use a hammer drill with a φ 8 bit to drill holes at the marked anchor points as shown in as shown in Figure 5-13. Use the cleaner to clean the dust inside and around the holes and measure the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to push the two plastic expansion sleeve into the holes.
LampSite Installation Guide 5 Installing a pRRU Step 5 Fit the four hooks of the pRRU into the installation kits, as shown in Figure 5-15. If the hooks are properly installed, a slight clack can be heard. NOTE It is recommended that you observe the installation from one side of the pRRU when inserting hooks into the kits. Figure 5-15 Installing a pRRU ----End 5.4.4 pRRU Installed on a Pole A pRRU can be installed on a metal pole indoors.
LampSite Installation Guide 5 Installing a pRRU Figure 5-16 Securing the pRRU installation kits on the metal pole If the diameter of the pole is larger than 70 mm, use the hose clamp to install the plate on the pole. The hose clamp is prepared by customers. Tighten the bolt with a torque of 5 N•m, as shown in Figure 5-17. Figure 5-17 Securing the pRRU installation kits on the metal pole Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU Step 3 Fit the four hooks of the pRRU into the installation kits, as shown in Figure 5-18. If the hooks are properly installed, a slight clack can be heard. NOTE It is recommended that you observe the installation from one side of the pRRU when inserting hooks into the kits. Figure 5-18 Installing a pRRU ----End 5.4.
LampSite Installation Guide 5 Installing a pRRU Figure 5-19 Anchor points of the pRRU installation kits (unit: mm) (1) Panel (2) Plate (3) Anchor point CAUTION To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with bit 8 to drill holes at the anchor points. Step 4 Lead the bolt M6x80 through the panel and daughter board, and tighten the torque screwdriver to a torque of 5 N•m, as shown in Figure 5-20.
LampSite Installation Guide 5 Installing a pRRU Figure 5-20 Installing the pRRU installation kits Step 5 Fit the four hooks of the pRRU into the installation kits, as shown in Figure 5-21. If the hooks are properly installed, a slight clack can be heard. NOTE It is recommended that you observe the installation from one side of the pRRU when inserting hooks into the kits. Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU Figure 5-21 Installing a pRRU ----End 5.4.6 pRRU Installed on a Keel If the ceiling cover cannot bear the pRRU, the pRRU can be installed on the keel of a ceiling. Context Before installing the pRRU on a keel, ensure that the keel is strong enough to bear the pRRU. l The installation kits of the pRRU can be installed on the keel of the following specifications: GBT 11981-2008, JIS A6517-2002, and ASTM C635 C635M-2007.
LampSite Installation Guide 5 Installing a pRRU Figure 5-22 Anchor points on a plate (unit: mm) CAUTION To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill to drill holes at the anchor points. You are advised to use the hammer drill Ф12. Step 4 Lead the bolt M6x80 through the installation plate and ceiling cover, and then socket to tighten the bolt to a torque of 5 N•m, as shown in Figure 5-23.
LampSite Installation Guide 5 Installing a pRRU Figure 5-23 Installing the pRRU installation kits Step 5 Fit the four hooks of the pRRU into the installation kits, as shown in Figure 5-24. If the hooks are properly installed, a slight clack can be heard. NOTE It is recommended that you observe the installation from one side of the pRRU when inserting hooks into the kits. Issue 02 (2014-05-27) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU Figure 5-24 Installing a pRRU ----End 5.5 Installing the AC/DC Power Adapter (Optional) The pRRU can obtain power supply using the AC/DC power adapter, which is used as required. An AC/DC power adapter is small and can be installed on a wall or pole. When it is installed, a support for it is required. Context l An AC/DC power adapter is small and can be installed on a wall or pole. When it is installed, a support for it is required.
LampSite Installation Guide 5 Installing a pRRU Figure 5-25 Anchor points of the support for the AC/DC power adapter (unit: mm) 2. Use a hammer drill Ф6 to drill holes at anchor points, as shown in Figure 5-26 The diameter of the hole is 6 mm, the depth is 25mm to 30 mm, and the interval of the two holes is 50 mm. Figure 5-26 Drilling holes and installing expansion bolts 3. Issue 02 (2014-05-27) Use two tapping screws to secure the power adapter support to the wall, as shown in Figure 5-27.
LampSite Installation Guide 5 Installing a pRRU Figure 5-27 Tightening the power adapter support 4. Issue 02 (2014-05-27) Place the AC/DC power adapter on the support by referring to Figure 5-28. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU Figure 5-28 Installing the AC/DC power adapter l On a pole 1. Issue 02 (2014-05-27) Route the cable ties through the notches on the support and secure the fixing hoops to a pole, as shown in Figure 5-29. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
LampSite Installation Guide 5 Installing a pRRU Figure 5-29 Wrap binding straps 2. Place the AC/DC power adapter on the support by referring to Figure 5-30. Figure 5-30 Wrap binding straps ----End 5.6 Installing the Extender (Optional) This section describes the Extender installation process. Context When an RHUB and a pRRU need extended install, use extender. With the Extender, the distance of the pRRU and RHUB can be extended by the Extender up to a total distance of 200 m.
LampSite Installation Guide 5 Installing a pRRU Procedure Step 1 Use a marker to mark the two anchor points according to inter-hole spacing, as shown in Figure 5-31. Figure 5-31 Marking anchor points Step 2 Drill holes at the anchor points, and install expansion bolt assemblies, as shown in Figure 5-32. The diameter of the hole is 6 mm, and the depth is 25 mm to 30 mm.
LampSite Installation Guide 5 Installing a pRRU Figure 5-33 Installing Extender ----End 5.7 Installing pRRU Cables This section describes the procedure of installing the pRRU cables. 5.7.1 Cabling Requirements Cables must be routed according to the specified cabling requirements to prevent signal interference. NOTE If certain cables listed below are not required, skip the requirements for routing these cables.
LampSite Installation Guide 5 Installing a pRRU l Different types of cables must be separately routed with a minimum spacing of 30 mm and cannot be entangled. l The cables are bound tightly and neatly and the sheaths of the cables is intact. l The cable ties face the same direction and all cable ties bound at similar positions must be in a straight line. l The extra length of each indoor cable tie must be cut off.
LampSite Installation Guide 5 Installing a pRRU NOTE l The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.
LampSite Installation Guide 5 Installing a pRRU NOTE l The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU.
LampSite Installation Guide 5 Installing a pRRU 2, the TX port and RX port are ANT2 and ANT3, respectively. For external antennas corresponding to RF daughter board 3, the TX port and RX port are ANT4 and ANT5, respectively. l The external antenna system is optional, and the pRRU jumpers are not delivered. By default, the pRRUs are configured with built-in antennas. If the external antenna system is connected, the antenna system automatically switches to the external one.
LampSite Installation Guide 5 Installing a pRRU Figure 5-37 pRRU cable connection (2) (1) Ethernet cable (2) RF jumper (3) AC/DC power adapter (4) Power cable of the AC/DC power adapter NOTE The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. 5.7.
LampSite Installation Guide 5 Installing a pRRU 5.7.6 Installing an Ethernet Cable This section describes how to install an Ethernet cable. Prerequisites l Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. l Cables of Category 5e (enhanced) or higher specification is used for connecting the RHUB and pRRU.
LampSite Installation Guide 5 Installing a pRRU 3. Connect the RJ45 connector at the other end of the Ethernet cable to the transmission port of the AC based on the engineering design, as shown in Figure 5-39. Figure 5-39 Installing an Ethernet cable (1) Ethernet cable (2) GE port on the pRRU (3) CPRI_E0 port on the pRRU NOTE The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable.
LampSite Installation Guide 5 Installing a pRRU Figure 5-40 Removing the pRRU antenna housing Step 2 Use a torque wrench with a torque of 0.6 N•m to connect the SMA straight male connector on a jumper to the ANT port on the pRRU panel. NOTICE Tighten it with hands, and then use a torque wrench to tighten it with a rotational speed of less than or equal to 2.4 rpm to tighten it.
LampSite Installation Guide 5 Installing a pRRU Figure 5-41 Installing jumpers between the pRRU and external antennas ----End 5.7.8 Installing adapter power cables The pRRU can be powered by the AC/DC power adapter. Prerequisites l The pRRU use the AC/DC power adapter to obtain power supply, and the AC/DC power adapter is installed.
LampSite Installation Guide 5 Installing a pRRU Figure 5-42 Installing adapter power cables Step 4 Route cables by referring to 4.4.1 Requirements for Cable Layout. ----End 5.8 Checking the pRRU Hardware Installation pRRU hardware installation checking includes hardware and cable installation checking. Table 5-8 lists the hardware installation checking items. Table 5-8 Hardware installation checking list No. Item 1 Ensure that the pRRU is not grouned.
LampSite Installation Guide 5 Installing a pRRU No. Item 4 The cable ties are evenly spaced. The signal cables are bound neatly with cable ties to proper tightness, and arranged at even intervals in the same direction. 5 The extra length of the cable ties is cut and removed. The cut surfaces of the indoor cables are smooth and have no sharp edges. 6 The cable layout facilitates maintenance and expansion. 7 Correct and clear labels are attached to both ends of the signal cables.
LampSite Installation Guide 5 Installing a pRRU If the RUN Indicator... Because... Then... Steady on There is power input, but the board is faulty. Power off the power supply, rectify the fault, and power on the pRRU. Steady off There is no power input, or an alarm is reported on the board. Power off the power supply and check the power input. If no fault is found after the pRRU is powered off, clear the fault on the board, and power on the pRRU.
LampSite Installation Guide 6 Appendix 6 Appendix About This Chapter This chapter describes reference information during installation and the procedures for installing RF daughter boards on a pRRU in capacity expansion scenarios. 6.1 MAC Collection Template This section describes the MAC collection template for a pRRU with three transmission ports. 6.
LampSite Installation Guide 6 Appendix 6.1 MAC Collection Template This section describes the MAC collection template for a pRRU with three transmission ports. The MAC collection template is used to record the installation position, MAC address of the site at the initial installation stage to facilitate subsequent commissioning and maintenance. Table 6-1 shows the MAC collection template. Table 6-1 MAC collection template No.
LampSite Installation Guide 6 Appendix Figure 6-1 Slot for installing the RF daughter boards NOTE l Unless otherwise specified, LTE mode in this document refers to LTE TDD and LTE FDD. l This section describes how to install an RF daughter board in slot S2 as an example. Procedure Step 1 Instruct the network operator to block the pRRU. l On the UMTS side, log in to the LMT and run the BLK BRD command to block the RF daughter board.
LampSite Installation Guide 6 Appendix Figure 6-2 Removing the pRRU housing NOTE l Either Phillips screws or protection screws can be used for installing the pRRU housing and the RF daughter board, requiring the same installation operations. This section uses Phillips screws as an example to describe the installation operations. l Keep the Phillips screw secure for future use. Step 5 Install an RF daughter board in slot S2. 1.
LampSite Installation Guide 6 Appendix Step 6 Remove the SN label and mode label on the surface of the RF daughter board, as shown in Figure 6-4. Figure 6-4 Removing the SN label and mode label Step 7 Attach the removed SN label to the corresponding position for S2 label on the nameplate side of the pRRU housing and the mode label to a position (for the label of slot S2 on the side of the pRRU housing) between antenna ports ANT2 and ANT3, as shown in Figure 6-5.
LampSite Installation Guide 6 Appendix Figure 6-6 Installing the pRRU housing NOTE The Phillips screw is the one removed and kept in Step 4. Step 9 Power on the pRRU. Step 10 Instruct the network operator to unblock the pRRU. l On the UMTS side, log in to the NodeB LMT and run the UBL BRD command to unblock the RF daughter board of the pRRU. l On the LTE side, log in to the eNodeB LMT and run the UBL BRD command to unblock the RF daughter board of the pRRU.