User Manual
Table Of Contents
- About This Document
- Contents
- 1 Changes in the BTS3202E LTE Installation Guide
- 2 Installation Preparations
- 3 Information About the Installation
- 4 Unpacking the Equipment
- 5 Obtaining the ESN
- 6 Installation Process
- 7 Installing a BTS3902E
- 7.1 Mounting Kits for Installing a BTS3202E
- 7.2 Installing a BTS3202E on a Pole with the Diameter of 60 mm to 114 mm (2.36 in. to 4.49 in.)
- 7.3 Installing a BTS3202E on a Pole with the Diameter of 114 mm to 400 mm (4.49 in. to 15.75 in.)
- 7.4 Installing a BTS3202E on a Wall
- 7.5 Installing a BTS3202E on a Wood Pole
- 7.6 Installing BTS3202Es on an IFS06
- 8 Installing an AC Surge Protection Box and Related Cables
- 9 Installing Cables
- 9.1 Cabling Requirements
- 9.2 Cable Connections
- 9.3 Installing a PGND Cable and Equipotential Cable
- 9.4 Installing a BTS3202E Power Cable
- 9.5 (Optional) Installing a BTS3202E RF Jumper
- 9.6 Installing Transmission Cables
- 9.7 (Optional) Installing the Alarm Cable
- 9.8 Installing the RGPS Signal Cable (Optional)
- 10 Installing the Housing
- 11 Checking the BTS3202E Hardware Installation
- 12 Performing a Power-On Check on the BTS3202E
- 13 Appendix
8.1 Dimensions and Installation Clearance Requirements of
an AC Surge Protection Box
This section describes the dimensions and installation clearance requirements for an AC surge
protection box.
Figure 8-1 shows the dimensions of an AC surge protection box.
Figure 8-1 Dimensions of an AC surge protection box
Figure 8-2 shows the recommended installation clearance for an AC surge protection box.
Figure 8-2 Recommended installation clearance for an AC surge protection box
BTS3202E LTE
Installation Guide 8 Installing an AC Surge Protection Box and Related Cables
Issue Draft A (2011-07-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.