User Manual

Table Of Contents
11. Connect the power and data cables.
12. Install the access panel.
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server.
The installation is complete.
Installing a midplane 4LFF SAS/SATA drive cage
Observe the following:
A 1U heatsink is required for each processor when installing this option.
If you have a TPM, install it prior to this option.
If you have a type-a controller, install it prior to this option.
Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
4. Remove the access panel.
5. Remove the air baffle.
The air baffle is no longer needed. The drive cage acts as an air baffle for the server.
Installing a midplane 4LFF SAS/SATA drive cage 75