User Manual
Table Of Contents
- HPE ProLiant DL380 Gen10 Server User Guide
- Contents
- Component identification
- Operations
- Powering up the server
- Power down the server
- Extend the server from the rack
- Extending the server from the rack
- Removing the server from the rack
- Installing the server into the rack
- Remove the access panel
- Installing the access panel
- Removing the fan cage
- Installing the fan cage
- Removing the air baffle or midplane drive cage
- Installing the air baffle
- Removing a riser cage
- Removing a riser slot blank
- Removing the hard drive blank
- Releasing the cable management arm
- Accessing the Systems Insight Display
- Setup
- Hardware options installation
- Product QuickSpecs
- Introduction
- Installing the bezel and bezel lock
- Power supply options
- Drive options
- Fan options
- Memory options
- Controller options
- Installing a Universal Media Bay
- Drive cage options
- Installing a front 8NVMe SSD Express Bay drive cage
- Installing a front 6SFF SAS/SATA + 2NVMe Premium drive cage
- Installing a front 8SFF SAS/SATA drive cage in box 1
- Installing a front 8SFF SAS/SATA drive cage in box 2
- Installing a front 2SFF NVMe/SAS/SATA Premium drive cage
- Installing a midplane 4LFF SAS/SATA drive cage
- Installing a rear 2SFF SAS/SATA drive cage in the primary or secondary riser
- Installing a rear 2SFF SAS/SATA drive cage over the power supplies
- Installing a rear 3LFF SAS/SATA drive cage
- Riser and riser cage options
- Expansion slots
- Installing an intrusion detection switch
- Installing a Smart Storage Battery
- Installing a rear serial port interface
- Installing a Systems Insight Display
- Installing a FlexibleLOM adapter
- Installing a 1U or high-performance heatsink
- Installing a processor
- HPE Trusted Platform Module 2.0 Gen10 Option
- Cabling
- HPE ProLiant Gen10 DL Servers Storage Cabling Guidelines
- Cabling diagrams
- Cable routing: Front 2SFF drive option for SFF
- Cable routing: Front 2SFF drive option for LFF
- Cable routing: Front 2SFF drive options (3 position cable)
- Cable routing: Front 8SFF drive options
- Cable routing: Front 8SFF NVMe/SAS premium drive option
- Cable routing: Front 8SFF NVMe drive options
- Cable routing: Front 2SFF NVMe drive option for SFF
- Cable routing: Front 2SFF NVMe drive option for LFF
- Cable routing: Midplane 4LFF drive option
- Cable routing: Rear 3LFF drive option
- Cable routing: Rear 2SFF drive options
- Cable routing: HPE 12G SAS Expander to a controller
- Cable routing: Systems Insight Display
- Software and configuration utilities
- Server mode
- Product QuickSpecs
- Active Health System Viewer
- HPE iLO 5
- Intelligent Provisioning
- Management Security
- Scripting Toolkit for Windows and Linux
- UEFI System Utilities
- HPE Smart Storage Administrator
- USB support
- Redundant ROM support
- Keeping the system current
- Troubleshooting
- Safety, warranty, and regulatory information
- Specifications
- Support and other resources
- Documentation feedback
• Avoid touching pins, leads, or circuitry.
• Always be properly grounded when touching a static-sensitive component or assembly. Use one or more
of the following methods when handling or installing electrostatic-sensitive parts:
◦ Use a wrist strap connected by a ground cord to a grounded workstation or computer chassis. Wrist
straps are flexible straps with a minimum of 1 megohm ±10 percent resistance in the ground cords. To
provide proper ground, wear the strap snug against the skin.
◦ Use heel straps, toe straps, or boot straps at standing workstations. Wear the straps on both feet when
standing on conductive floors or dissipating floor mats.
◦ Use conductive field service tools.
◦ Use a portable field service kit with a folding static-dissipating work mat.
If you do not have any of the suggested equipment for proper grounding, have an authorized reseller
install the part.
For more information on static electricity or assistance with product installation, contact an authorized reseller.
Server box contents
The server shipping box contains the following contents:
• A server
• A power cord
• Rack-mounting hardware
• Documentation
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation."
Configuring the server
When the server is powered on, the POST screen is displayed. Use the following options to configure the
server:
• System utilities (F9)
Use this option to configure UEFI, RBSU, or other boot settings.
• Intelligent Provisioning (F10)
Use this option to configure drives, access Smart Storage Administrator, or begin installing or deploying an
operating system.
• Boot order (F11)
Use this option to select a boot device.
• Network boot (F12)
Use this option to PXE boot the server from the network.
Installing or deploying an operating system
Before installing an operating system, observe the following:
• Be sure to read the HPE UEFI requirements for ProLiant servers on the Hewlett Packard Enterprise
website. If UEFI requirements are not met, you might experience boot failures or other errors when
installing the operating system.
• Update firmware before using the server for the first time, unless software or components require an older
version. For more information, see "Keeping the system current on page 139."
48 Server box contents