User Manual
Table Of Contents
- HPE ProLiant DL380 Gen10 Server User Guide
- Contents
- Component identification
- Operations
- Powering up the server
- Power down the server
- Extend the server from the rack
- Extending the server from the rack
- Removing the server from the rack
- Installing the server into the rack
- Remove the access panel
- Installing the access panel
- Removing the fan cage
- Installing the fan cage
- Removing the air baffle or midplane drive cage
- Installing the air baffle
- Removing a riser cage
- Removing a riser slot blank
- Removing the hard drive blank
- Releasing the cable management arm
- Accessing the Systems Insight Display
- Setup
- Hardware options installation
- Product QuickSpecs
- Introduction
- Installing the bezel and bezel lock
- Power supply options
- Drive options
- Fan options
- Memory options
- Controller options
- Installing a Universal Media Bay
- Drive cage options
- Installing a front 8NVMe SSD Express Bay drive cage
- Installing a front 6SFF SAS/SATA + 2NVMe Premium drive cage
- Installing a front 8SFF SAS/SATA drive cage in box 1
- Installing a front 8SFF SAS/SATA drive cage in box 2
- Installing a front 2SFF NVMe/SAS/SATA Premium drive cage
- Installing a midplane 4LFF SAS/SATA drive cage
- Installing a rear 2SFF SAS/SATA drive cage in the primary or secondary riser
- Installing a rear 2SFF SAS/SATA drive cage over the power supplies
- Installing a rear 3LFF SAS/SATA drive cage
- Riser and riser cage options
- Expansion slots
- Installing an intrusion detection switch
- Installing a Smart Storage Battery
- Installing a rear serial port interface
- Installing a Systems Insight Display
- Installing a FlexibleLOM adapter
- Installing a 1U or high-performance heatsink
- Installing a processor
- HPE Trusted Platform Module 2.0 Gen10 Option
- Cabling
- HPE ProLiant Gen10 DL Servers Storage Cabling Guidelines
- Cabling diagrams
- Cable routing: Front 2SFF drive option for SFF
- Cable routing: Front 2SFF drive option for LFF
- Cable routing: Front 2SFF drive options (3 position cable)
- Cable routing: Front 8SFF drive options
- Cable routing: Front 8SFF NVMe/SAS premium drive option
- Cable routing: Front 8SFF NVMe drive options
- Cable routing: Front 2SFF NVMe drive option for SFF
- Cable routing: Front 2SFF NVMe drive option for LFF
- Cable routing: Midplane 4LFF drive option
- Cable routing: Rear 3LFF drive option
- Cable routing: Rear 2SFF drive options
- Cable routing: HPE 12G SAS Expander to a controller
- Cable routing: Systems Insight Display
- Software and configuration utilities
- Server mode
- Product QuickSpecs
- Active Health System Viewer
- HPE iLO 5
- Intelligent Provisioning
- Management Security
- Scripting Toolkit for Windows and Linux
- UEFI System Utilities
- HPE Smart Storage Administrator
- USB support
- Redundant ROM support
- Keeping the system current
- Troubleshooting
- Safety, warranty, and regulatory information
- Specifications
- Support and other resources
- Documentation feedback
Systems Insight Display
LED and color
Health
LED
System
power LED
Status
Power cap (off) — Amber Standby
Power cap (green) — Flashing
green
Waiting for power
Power cap (green) — Green Power is available.
Power cap (flashing amber) — Amber Power is not available.
IMPORTANT:
If more than one DIMM slot LED is illuminated, further troubleshooting is required. Test each bank of
DIMMs by removing all other DIMMs. Isolate the failed DIMM by replacing each DIMM in a bank with a
known working DIMM.
Rear panel components
Item Description
1 Primary riser slots 1-3 (Optional drive cage)
2 Optional riser slots 4-6 (Optional drive cage)
3 Optional riser slots 7-8 (Optional drive cage)
4 Power supply 1
5 Power supply 2
6 Video port
7 Serial port (optional)*
8 1Gb RJ-45 ports 1–4
9 iLO management port
10 USB 3.0 ports
11 FlexibleLOM slot
*When a tertiary riser cage is installed as shown, the serial port can installed in riser slot 6.
Rear panel components 17