User Manual

Table Of Contents
7. Install the FlexibleLOM adapter:
8. Install the riser cage.
9. Install the access panel.
10. Slide the server into the rack.
11. Connect the LAN segment cables.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server .
The installation is complete.
Hardware options installation 107