Instruction Manual
Table Of Contents
- G2 Backup System user guide
- Contents
- 1 Getting started
- 2 Home, Summary
- 3 Virtual Tape Devices
- 4 NAS
- 5 Appliance Configuration
- 6 Status
- 7 Replication
- 8 Administration
- 9 Restore processes with replication
- 10 Restore processes without replication
- 11 Understanding LEDs
- 12 Hardware monitoring
- 13 Troubleshooting
- Connecting to the StoreOnce Backup System from the backup application
- Connecting to the network
- Using the 10Gb ports (HP D2D4300 Series only)
- Performance
- Web Management Interface errors and warnings
- Power On/Off Problems
- Cannot connect to Web Management Interface
- NFS State handle error
- Cannot authenticate an iSCSI session
- Diagnostic Fibre Channel device
- If the HP StoreOnce Backup System runs out of disk space
- Cannot access a storage shelf (HP D2D4100 and 4300 Series Backup Systems)
- If backup or replication fails
- Recovering Devices that have ‘failed to start’ or have become read-only
- StoreOnce Backup System configuration problems
- Upgrade licenses
- Replacement of hardware
- Upgrades to component parts
- 14 Hard disk replacement
- A Extra information for G1 products
- Glossary
- About this guide
- Index

9. Enter a name for the Schedule and select the appropriate Scheduling parameters. Click Create.
Table 33 Job schedule parameters
This field allows you to provide a meaningful name for the scheduled job.Schedule Name:
Schedule Type:
• For daily jobs, select Daily.
• For weekly jobs, select Weekly.
• For jobs that you wish to run on a specific date in the month, select Day of the Month.
• For jobs that you wish to run on a specific day and week in the month, select Weekday
of Month.
• For jobs that you wish to run as soon as the cartridge has been written, select After
Write.
This field is not relevant for Daily jobs and After Write jobs. For Weekly jobs, select the
day of the week. For Monthly by day, select a day between 1 and 31. For months with
Day:
less than 31 days, the job is always run on the last day of the month. For Weekday of the
Month, select First/Second/Third/Fourth/Last week and then the day of the week.
This field is not relevant for After Write jobs. It is the time at which the job is to run: hour
(24-hour clock) and minute.
Time:
Use this check box to control whether a schedule is active. The default is active (box is
checked).
Active:
Use this check box you to control whether the cartridge is unloaded once the scheduled
job completes. The default is to remain loaded (the box is not checked). If the attached
device is a library the tape will be moved to the mail slot if there is an empty mail slot.
Unload After Completion:
This determines how the data that has been created on the physical cartridge is to be
verified with the original data on the HP D2D Backup system. There are three options:
None, Quick and Full. The default is Full.
Verify:
Sorting and searching scheduled jobs
Click on any column heading to sort jobs according to that criterion. For example, click on Next
Expiry Time to sort the jobs according to the time they next run.
Click on Show search-box to display a Filter field and one drop-down menu.
• Use the right-hand drop-down menu to filter on All, Name, Schedule or Mode/Slot.
• Type a search string into the Filter box.
Tape Attach 163