Installation guide
3-16 Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: d-ch03 Installing Hardware Options-J.doc Last Saved On: 7/13/01 11:36 AM
3. Press down on the latch to unlock the access panel .
4. Continue to hold the latch down while you slide the access panel toward
the rear of the server
.
Figure 3-14. Removing the access panel (tower server)
5. Remove the access panel from the server.
NOTE: Use the system configuration labels on the inside of the access panel to locate
system components and settings.
After installing hardware options for your ProLiant ML370 Generation 2
tower server, replace the access panel. Ensure that the panel is locked into
place securely before powering up the server.
Rack Server
To extend the server from the rack and remove the access panel:
1. If the server is operating, power down the server. See “Powering Down
the Server” in this chapter.
NOTE: Some hot-plug hardware options may be installed without powering down the
server or removing the access panel.