To power up the server:
1. Open the bezel and press the power button to power up the server.
Figure 5-3. Powering up the tower server
2. Observe the front panel LEDs to verify a successful power-on sequence.
The following table describes a successful power-on sequence.
Table 5-2
Front Panel LED Activity During the Power-On Sequence
Item Description
System power LED From amber to green
Internal health LED From off to green
External health LED From off to green
NIC LED From off to green
From off to flashing green for network activity
Note: For a detailed explanation of all system LEDs, see Appendix E, LED Indicators and