Installation guide
Installing the Rack Server 4-17
Compaq Confidential – Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: e-ch04 Installing the Rack Server-J.doc Last Saved On: 7/12/01 1:31 PM
Powering Up the Server
Power up the server after the peripheral and power cords are connected to the
server.
WARNING: To reduce the risk of electrical shock or damage to the equipment:
■ Do not disable the power cord grounding plug. The grounding plug is an
important safety feature.
■ Plug the power cord into a grounded (earthed) electrical outlet that is
easily accessible at all times.
■ Unplug the power cord from each power supply to disconnect power to the
equipment.
■ Do not route the power cord where it can be walked on or pinched by
items placed against it. Pay particular attention to the plug, electrical
outlet, and the point where the cord exits from the server.
To power up the server:
1. Press the power button to power up the server.
Figure 4-17. Powering up the rack server
2. Observe the front panel LEDs to verify a successful power-on sequence.