Installation guide
Installing the Rack Server 4-13
Compaq Confidential – Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: e-ch04 Installing the Rack Server-J.doc Last Saved On: 7/12/01 1:31 PM
4. Place the screw retaining plate against the inside of the vertical rack rail
and at the same time, align the two thumbscrews on the cable
management arm with the two screw holes on the retaining plate
.
5. Tighten both thumbscrews to secure the cable management arm to the
rack
.
Figure 4-12. Securing the cable management arm to the rack
Connecting the Power Cord and Peripheral Devices
After the server has been installed in the rack, connect the power cord and
peripheral devices to the connectors located on the rear panel of the server.
Icons on the back of the server identify the function of each connector.
WARNING: To reduce the risk of electrical shock or fire, do not plug
telecommunications/telephone connectors into the NIC receptacles.
CAUTION: If the Remote Insight Lights-Out Edition is installed in your server,
ensure that you connect your video cable into the video connector on the rear of
the Remote Insight Lights-Out Edition. The standard video connector on the
server rear panel is not used when the Remote Insight Lights-Out Edition is
installed. For more information, see Chapter 7, “Remote Insight Lights-Out
Edition Options.”