Installation guide

4-12 Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide
Compaq Confidential Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: e-ch04 Installing the Rack Server-J.doc Last Saved On: 7/12/01 1:31 PM
Installing the Cable Management Arm
A triple-hinged cable management arm ships with each server. This arm
attaches to the server chassis and to the rear frame of the rack. Hook-and-loop
straps included with the management arm are used to tie down and manage all
cables leading to and from the server.
Two hinges enable the cable management arm and cables to move forward
through the rack when the server is extended. A third hinge allows the cable
management arm to swing back and out of the way during hot-plug power
supply installation and removal procedures.
IMPORTANT: Install the cable management arm after the server is installed in the rack.
To attach the cable management arm to the server and rack:
1. Align the two keyholes on the cable management arm over the spools on
the rear panel of the chassis.
2. Slide the arm down to secure the keyholes onto the spools.
3. Tighten the thumbscrew to secure the cable management arm to the
server
.
Figure 4-11. Attaching the cable management arm to the server