Installation guide
Installing the Rack Server 4-9
Compaq Confidential – Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: e-ch04 Installing the Rack Server-J.doc Last Saved On: 7/12/01 1:31 PM
Installing the Server in the Rack
CAUTION: To avoid destabilizing the rack, install servers starting from the
bottom of the rack.
To install the server in the rack:
1. Use the server handles located on both sides of the server to lift it into
position.
Figure 4-7. Lifting with the server handles
2. Carefully align the tapered ends of the server rails on the rear of the
server with the open end of the spring-load rack rail assembly at the
front of the rack.