Installation guide
4-8 Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer: CDresden Project: Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide Comments: Graphics Replaced - Checked
Part Number: 203510-001 File Name: e-ch04 Installing the Rack Server-J.doc Last Saved On: 7/12/01 1:31 PM
5. Insert the two tabs into the holes that you marked on the inside of the
rear of the rack.
Figure 4-6. Inserting the spring-load rails into the rear of the rack
NOTE: Other rack devices removed for clarity.
6. When the rail tabs are resting securely in the vertical rail holes, release
the rail and spring release tabs. The assembly locking mechanism clicks
into place.
7. Repeat steps 2 through 6 for the second spring-load rail assembly.