Service and Maintain

Periodic maintenance 64
2.
Power down the IT equipment in the zone where the leak is located.
3. Determine the affected heat exchanger.
4. Close and danger tag the supply and return valves to the affected heat exchanger.
If the heat affected exchanger cannot be identified, close all the heat exchanger supply and return
valves in the affected zone and open one supply valve at a time to determine the location of the leak.
5. Repair the leak or contact HP if you are still within your service contract.
Humidifier (if installed)
Component to be inspected Task Frequency Capable Party
Humidifier
Inspect for water leaks, verify
that no sparks form between
the electrodes during
operation
Inspect the general operation
of the cylinder.
Every 2
weeks, if
staffed
Quarterly, if
not staffed
Qualified personnel
Humidifier drains
Verify the following:
Drains are in working order
There is an air gap at the
f
unnel/drain entry into the site
system
Drain discharge is not getting
water on external equipment
or grounding system
Quarterly
Qualified personnel
Put the humidifier in system flush
mode and inspect drain flow and
water supply flow. Inspect, clean,
and/or replace as necessary.
Quarterly Qualified personnel
Inspect for any internal or external
water leaks, repair or replace
leaking components.
Quarterly Qualified personnel
Using LLS, verify proper cylinder
operation. Inspect the cylinder for
blackened areas and, if present,
check the condition of the
electrodes. If necessary, replace
the cylinder.
Quarterly Qualified personnel
Replace the cylinder. Annually Qualified personnel
ECS
Component to be inspected Task Frequency Capable party
Full system functional check
Check the operation of all system
components.
Quarterly Qualified personnel
Check and clear the alarm log. Quarterly Qualified personnel
Inspect and test the ECS battery
backup system.
Every 2 years Qualified personnel