Service and Maintain

Periodic maintenance 69
Component to be inspected Task Frequency Capable Party
Exterior water proofing check for
ingress using water hose
Annually Certified facilities
personnel
Switchgear
Component to be inspected Task Frequency Capable Party
Switchgear
Infrared inspection of all electrical
power connections while under
normal load
Annually HP and certified
facilities personnel
Grounding and electrical systems Annually HP and certified
facilities personnel
Panel operational testing Annually HP and certified
facilities personnel
Breakers/disconnects Annually HP and certified
facilities personnel
Third-party components
See the Operations and Maintenance Manual for the HP Performance Optimized Datacenter 40c for other
required maintenance items.
UPS
Component to be inspected Task Frequency Capable Party
UPS
Vacuum Pump oil change Annually HP
Log file review Annually HP
Calibration verification Annually HP
Telemetry review
Annually
HP
Replace bearings Every 2.5 to 3
years
HP