Service and Maintain

Periodic maintenance 68
HP POD 40c G2 structure
Component to be inspected Task Frequency Capable Party
Complete structure
Visually inspect the structural
integrity.
Annually Certified facilities
personnel
Inspect the door operation and
inspect the door gaskets for water
and air leaks.
Annually Certified facilities
personnel
Visually inspect the paint. Perform
prep and touch-up as necessary.
Annually Certified facilities
personnel
Life safety
Component to be inspected Task Frequency Capable Party
EPO system
EPO functional test with manual
and automatic shutdown. (Verify
all shunt-trips on all panels trip.)
Annually Licensed EPO safety
contractor
EPO alarms Annually Licensed EPO safety
contractor
EPO bypass keyed switch
(functional test)
Annually Licensed EPO safety
contractor
EPO bypass switch located at
each personnel door. (Functional
test. Verify system time-out reset
when switch is activated.)
Annually Licensed EPO safety
contractor
EPO status light. (Verify operation
in different modes. Replace lamps
as necessary.)
Annually Licensed EPO safety
contractor
Exit lights. (Verify exit lights are
visible when all lighting is off and
POD doors are closed.)
Bi-annually Certified facilities
personnel
Tritium exit signs (Visual
inspection)
Bi-annually Certified facilities
personnel
Personnel door emergency egress
panic bars. (Visual and
operational inspection.)
Bi-annually
Certified facilities
personnel
Security
Component to be inspected Task Frequency Capable Party
System functional test
Visual inspection and operational
test of door access contact
switches
Annually Certified facilities
personnel
Visual inspection and operational
test of door access card readers,
electric strikes, and door release
switches at each personnel door
and/or in each personnel door
panic bar
Annually Certified facilities
personnel