Service and Maintain

Periodic maintenance 66
Component to be inspected Task Frequency Capable Party
Electrical panel, breaker,
disconnect, and transformer visual
inspection for condensation or
other degradation of buses and
connections
Annually Licensed electrician
Electrical panel, breaker,
disconnect, and transformer bolt
torque testing. Retighten as
necessary.
Annually Licensed electrician
Grounding system resistance test Bi-annually Licensed electrician
Ground and grounding
connection/lug located internal of
each electrical panel torque test.
Clean and retighten as necessary.
Bi-annually Licensed electrician
Grounding connection/lug
located external on the POD
torque test. Clean and retighten as
necessary.
Bi-annually Licensed electrician
Service entrance ground
connection/lug located at external
transformer and switchboard
torque test. Clean and retighten as
necessary.
Bi-annually Licensed electrician
Service entrance grounding
ground-rod/ground well
connecting/lug located at
locations external to POD torque
test. Clean and retighten as
necessary.
Bi-annually Licensed electrician
Grounding system bonding
jumpers connecting racks to POD
structure and rack to rack torque
test. Clean and retighten as
necessary.
Bi-annually Licensed electrician
Panel breaker operational test
(Simulate a breaker response to a
load greater than the breaker
rating.)
Annually Licensed electrician
Visual inspection of breakers,
disconnects, motor starters, and
fuse holders
Bi-annually Licensed
electrician/Certified
facilities personnel
Calibrate all temperature,
pressure, and humidity sensors.
Annually Certified facilities
personnel
Visual inspection of lighting
fixtures and lamps. Measure foot
candles and replace as necessary.
Bi-annually Licensed
electrician/Certified
facilities personnel