Getting Started Guide

Index 40
A
about this guide 5
areas prone to lightning or power surges 22
assembly 31
assembly area 24
C
cables, FCC compliance 36
Canadian notices 36
capacity limitations 7
central facility infrastructure connections 17
clearance area 8, 10
cold weather considerations 22
connection portals 17
connections, additional 17
connections, facility 17
D
delivery considerations 31
dimensions 8
E
electrical power capacity 7
electrical system 15
environmental considerations 22
environmental control system (ECS) 17
environmental risks 22
equipment, installation 24
expansion 11
F
facility connections 17
FCC (Federal Communications Commission)
notice 35
Federal Communications Commission (FCC)
notice 35
fire and safety 20
fire suppression 6
future expansions 11
G
grounding requirements 11
H
HP site preparation drawing package 23
humidifier 20
I
installation 24
installation equipment 24
IT cable portals 17
L
lifting layout and requirements 24
lightning protection 22
M
materials, piping 15
mechanical cooling capacity 7
modifications, FCC notice 35
N
network connections 17
O
other objects 25
overview 5
P
permit requirements 23
piping materials 15
portals, connection 17
power infrastructure installation 15
power surges 22
pre-delivery 31
preparing for assembly 31
project coordination 23
proximity to utilities and drains 12
Index