Service and Maintain
Site requirements 7
Operational clearance around the HP POD 240a
Power (on page 17)
Water supply (on page 15)
Drainage (on page 16)
Site pad (on page 7)
Other structures (on page 7)
Site pad
The structural design of the HP POD 240a site pad design is based on specific weight load locations,
accounting for the HP POD 240a structural footing and supported IT infrastructure.
Other structures
If a customer-provided vestibule or other structure will be installed at the HP POD 240a site, the following
specifications must be maintained:
Flashing must be installed to the exterior of the HP POD 240a in the location where the other structure
will be attached to protect the HP POD 240a and ensure a waterproof barrier.
Access catwalks and/or landings might be required to maintain the required egress from the HP POD
240a HVAC/DX service area.
Access catwalks and/or landings might be required to maintain the required access to the HP POD
240a electrical panels.