Service and Maintain
Preparing for delivery and assembly 13
Temporary lighting and power
Proper temporary lighting and power must be installed and maintained in all construction work areas.
When using temporary lighting:
Label panels and breakers that are used for temporary lighting and power.
The location of panels must be shown on the construction site plan and posted at the entrance to work
area.
Lamps for general illumination must be protected from breakage, and metal shell sockets must be
grounded.
Temporary lights must not be suspended by cords, unless they are so designed.
Storage requirements
CAUTION: The HP POD 240a must maintain 20% relative humidity to minimize condensation
and oxidation within the HP POD 240a.
Changes in ambient temperatures cause condensation in a HP POD 240a that is not operating. If the HP POD
240a is placed in storage or is non-operating mode for over 72 hours, HP recommends using one of the
following methods to minimize condensation and oxidation within the HP POD 240a:
Dessicant unit
Dessicant material
Heater with a fan
Air conditioner with heater strip
Consult with HP Services to determine the most effective method.
Assembly prerequisites
Before installing the HP POD 240a, verify that the following prerequisites have been met:
All components have been delivered to the facility.
The HP POD 240a and power distribution components are in final location.
Facility power, water, and drainage are at the final location.
Provisions for properly grounding the HP POD 240a have been made.
There are required clearances, including overhead
Coordination of all trade personnel required for assembly
Completed Job Safety Analysis
Required PPE and head protection (on page 12) for all personnel is available