Setup and Install

Site requirements 5
You have chilled water at your final location.
You have made provisions for properly grounding the HP POD.
System utilities
Your site location must accommodate the following utilities:
Cooling water
Electrical power
Drainage
Power
Item Component
1 Chilled water supply connection
2 Chilled water return connection
3 External communication box (if fitted)
ECS
Fire
Security
Telephone