Setup and Install
Site requirements 5
• You have chilled water at your final location.
• You have made provisions for properly grounding the HP POD.
System utilities
Your site location must accommodate the following utilities:
• Cooling water
• Electrical power
• Drainage
Power
Item Component
1 Chilled water supply connection
2 Chilled water return connection
3 External communication box (if fitted)
•
ECS
•
Fire
•
Security
•
Telephone