User's Manual

Supercap pack mounting kit
The HP Smart Array P711m Controller includes a cabled Supercap Pack which mounts inside the
server using the orderable AM341A Mounting Kit for Low profile battery (HP part number
AD399-2132A KIT, RAID BATTERY HOLDER). This kit contains a black metal mounting bracket
and a mezzanine card blank. The mounting bracket clips onto a mezzanine card in slot 1. If no
card is used in slot 1, the mezzanine card blank included in the kit must be installed to mount the
bracket.
For installing the bracket on to the server blade, the mounting bracket has:
A mezzanine post loop that slides over the abutting mezzanine 2 post
A thumbscrew clip that clips over the mezzanine 1 card or mezzanine blank thumbscrew
located at the rear of the blade
• A mezzanine foot that clips over the edge of the mezzanine 1 card or mezzanine card
blank that is installed closest to the center of the blade
For installing the Supercap Pack onto the bracket, the mounting bracket has:
A C-hook to restrain the cable
Two restraining clips to restrain the Supercap Pack
431
Mezzanine foot C-hookCable restraining clips
2
Mezzanine post loop
Installing the Supercap mounting bracket
1. Power off the server blade and remove it from the server blade enclosure (“Preparing the
server blade for servicing).
2. Remove the access panel (Access panel” (page 106)).
3. Remove the DIMM baffle (“DIMM baffle” (page 108))
4. Temporarily remove any mezzanine card installed in slot 2 (“Mezzanine cards” (page 115)).
NOTE: Mezzanine slot 1 must contain the P711m Controller, another mezzanine card, or
the mezzanine card blank. If you are installing the P711m card in mezzanine slot 1, do so
now following the instructions “Installing the P711m Controller Board.” If you are not installing
the P711m card in mezzanine slot 1, and no other mezzanine card is present in slot 1, then
install the mezzanine card blank at this time.
5. Clip the mounting bracket onto the mezzanine card or mezzanine card blank.
Installing internal components 51