Service manual
Chapter 6 Replacing Parts
85
5. Gain access to the system board:
a. Pull out the anti-tip foot at the bottom of the rack, then slowly slide the HP Netserver chassis
out from the rack as far as it can be extended.
b. Remove the cover.
c. Remove the air flow guide.
6. Ensure the processor speed of the second processor (CPU 2) is the same as the primary
processor.
If you are upgrading the second processor to a faster processor speed than the primary
processor, the primary processor must also be changed. Both processors must have the same
product number, which includes the same clock speed, cache size, and FSB speed.
The supported processors only perform at the rated speed indicated on the processor in the HP
Netserver.
7. Open the ZIF (Zero Insertion Force) lever. Then lift the terminator out of the socket and place it
on anti-static surface or container.
To open the ZIF lever, pull the lever out away from the ZIF socket, and then raise it 90
° to the
system board.
Processor
Socket
Terminator
ZIF Lever
Removing the Terminator