Installation guide
7
2 Installation
Installation Overview
NOTE If you plan to install a duplex board on the second hot-swap
mass storage cage, do so before you install the cage. Refer to
HP NetServer Duplex Kit Installation Guide for instructions.
Installing a second hot-swap mass storage cage in your HP NetServer requires
these general steps, which are described in this chapter:
•
Step 1: Power Down and Disconnect
• Step 2: Unlock and Remove Front Bezel
• Step 3: Remove Cover 1 and Cover Plate
• Step 4: Install Mass Storage Cage
• Step 5: Remove Fan Assemblies
• Step 6: Install SCSI Cable
• Step 7: Connect Power Harness
• Step 8: Replace Fan Assemblies
• Step 9: Replace Cover 1 and Front Bezel
• Step 10: Install Hard Disk Drive Modules
• Step 11: Reconnect Power Cords and Other Cables
• Step 12: Verify Installation
After you finish the installation, go to Chapter 3 to configure your mass storage.
Step 1: Power Down and Disconnect
Do the following to power down and disconnect the HP NetServer:
1. Back up your system.
2. Bring down the network properly.