SNA NRJE Node Managers Guide (30292-90007)

54 Chapter4
NA NRJE Workstation Startup and Shutdown
Before You Start a Workstation
Before You Start a Workstation
Before you begin starting up workstations, you must have prepared a
job stream file for each workstation you want to start. Each job must be
named
Wsid
.NRJE.SYS, where
Wsid
is the workstation’s configured
identification. When you issue a command to start an NRJE
workstation, the corresponding
Wsid
.NRJE.SYS file is streamed. Each
job must be in this format:
!JOB NRJEuser.SYS,NRJE
any JCWS, etc.
!RUN NRJEMON;INFO=
“Wsid”
!EOJ
where
Manager
is a user who has all the MPE capabilities except system
manager (SM), which is optional.
Wsid
is the wsid for the workstation. This must match the wsid in
the job’s file name.
This stream job starts NRJEMON, which is the monitor for SNA NRJE
workstations. You can include other MPE commands in the stream file.
For example, a JCW can be used to determine whether to automatically
restart NRJE. See the SNA NRJE User/Programmer Reference
Manual for more information.
NOTE
If you are using the SNA Server for the node, the stream job is
different. See Chapter 2 , “SNA NRJE Installation Guidelines,” of the
HP SNA Server/Access User’s Guide for more information.
If several NRJE workstations are going to be run simultaneously,
increase the limit on the number of jobs so that it accommodates the
number of workstations that will be active.