HP e3000 MPE/iX System Software Maintenance Manual (Release C.75.00) (30216-90344)

Chapter 4
Preparing Your System
4.8 Selecting HP Patch/iX Activities
93
If a purge operation is not marked for verification, no confirmation prompt will appear.
4. Press
[F4]
Process List.
5. The prompts that display are specific to the patch activities you selected. Respond to the prompts as
appropriate.
HP Patch/iX prompts for the LDEV of:
Reactive tape
PowerPatch tape
SUBSYS tape
HP Patch/iX restores files and displays the status as the preparation phase progresses.
When the setup operations are complete, HP Patch/iX automatically returns you to the Main menu. The
status area indicates the type of patch activity that you selected.
If you selected Adding (SUBSYS) Products, the Main menu displays Create [Tape]; you will no longer
be able to select Create [Stage] [Tape].
Selecting HP Patch/iX Activities completed. Go to the next section on your checklist.