HP e3000 MPE/iX System Software Maintenance Manual (Release C.75.00) (30216-90344)
Chapter 2
Task Checklists
Checklist G. Update with Tape
44
Record data communication products:
— 5.13 Applying the CSLT Modification
— 5.14 Restarting the System
—5.15 Rerunning AUTOINST—Required only if applying PowerPatch .
Chapter 6, “Finishing the Process.”
— 6.1 Configuring Datacomm and UPS
— 6.4 Setting Passwords, Lockwords, and UDCs
— 6.5 Configuring and Updating Manually Installed Products
— 6.6 Setting Up the TAR Utility
— 6.7 Performing the Final Reboot
— 6.8 Restarting Selected System Functions
— 6.9 Backing Up Your System
—6.11 Finishing Up
Checklist G tasks completed.
If you have Reactive patches to apply, proceed to either one of these checklists:
• Checklist A, “Manage Patches”
• Checklist B, “Manage Patches by Staging Area”
Record system change:
System name:
System type:
Date change made:
Change performed by:
OS version from:
OS version to:
Comments: