High Availability FailOver/iX Manual (32650-90911)

Recovering From a Failover
GONEXT (go)
To execute
GONEXT
:
1. Start SYSGEN.
2. At the sysgen> prompt, enter io.
3. At the io> prompt, enter ha.
4. Execute the
GONEXT
(go) command using the syntax.
go <Ldev>
For example,
ha> go 8
5. Then execute the
DOHA
command
In this example, all I/Os for Ldev 8 will be rerouted to the primary path
configured. Should this attempt fail, you will be notified and the I/Os will
continue on the alternate data path.
Appendix A, "Sample Failover and Recovery." provides a sample failover
scenario and documents how to recover.
43