SNA NRJE User/Programmer Reference Manual (30292-90006)

Chapter 2 45
Getting Started
NRJE Startup
NRJE Startup
Later in this chapter, an example illustrates how to start and stop
NRJE. To start NRJE, you must do the following:
Activate the data communications line and host PU and LUs.
Start the SNA node using an MPE SNACONTROL START command.
Start the NRJE workstation using an MPE NRJECONTROL START
command or an NRJE STARTWS command.
NOTE
A job stream file must exist before you start a workstation.
An MPE job stream file is required to start each workstation. The job
stream starts NRJEMON, which is the father communication process
for an NRJE workstation. The structure of the job stream file and the
STARTWS command are described in the SNA NRJE Node Manager’s
Guide. SNACONTROL START is described in the SNA Link Services
Reference Manual or the SNA Link/XL Node Manager’s Guide. The
MPE command NRJECONTROL START is also described in the SNA NRJE
Node Manager’s Guide.