HP e3000 MPE/iX System Software Maintenance Manual (Release C.75.00) (30216-90344)

Chapter 2
Task Checklists
Checklist D. Add-on with Tape
38
Record data communication products:
5.13 Applying the CSLT Modification
5.14 Restarting the System
Chapter 6, “Finishing the Process.
6.1 Configuring Datacomm and UPS
6.4 Setting Passwords, Lockwords, and UDCs
6.5 Configuring Manually Installed Products
6.7 Performing the Final Reboot
6.8 Restarting Selected System Functions
6.9 Backing Up Your System
—6.11 Finishing Up
Checklist D tasks completed.
If you have Reactive patches to apply, proceed to one of these checklists:
Checklist A, “Manage Patches”
Checklist B, “Manage Patches by Staging Area”
Record system change:
System name:
System type:
Date change made:
Change performed by:
OS version from:
OS version to:
Comments: