HP e3000 MPE/iX Release 7.0 System Software Maintenance Manual (30216-90317)
Chapter 5 111
Modifying Your System
5.1 Securing and Backing Up the System for Tape Tasks
:PURGE HPINSTFL.INSTALL.SYS
12.Purge spool files.
:SPOOLF @;DELETE
13.Purge staging groups.
:PURGEGROUP UNL
:PURGEGROUP USL
:PURGEGROUP UXL
Verify each purge, type Y, at the prompt.
Do not purge the group install.sys or the file supacct.pub.sys; they are needed for
future patch and add-on processes.
14.If you are performing an Update task, go to Step 15.
If you are performing an Add-on task, go to Step 16.
Update Tasks
15.Purge specified files and groups.
a. Purge each os
xnn
and xpt
nnnn
group in the telesup account.
:REPORT OS?##.TELESUP
:PURGEGROUP OSxnn.TELESUP
:REPORT XPT####.TELESUP
:PURGEGROUP XPT@.TELESUP
where:
x
— an alphabetic character
nn
— the numeric release number (for example, OSA10.TELESUP and
0SB23.TELESUP).
These files may not exist.
b. Go to Step 16.
16.Rename the COMMAND.PUB.SYS file.
:RENAME COMMAND.PUB.SYS,
command_name
where command_name is a temporary name you are assigning the file. This preserves
your UDC information for later use. Record the temporary name on your checklist.
• Securing and Backing Up the System for Tape Tasks completed. Go to the
next section on your checklist.